Launch Vehicle Mark-3 (GSLV Mk III)
India2017 to 2025The Launch Vehicle Mark-3 (GSLV Mk III) stands 43.4 m (142 ft) tall and can lift 10,000 kg to low Earth orbit. As of 28 November 2026, it has 8 launches on record, from 5 June 2017 to 24 December 2025, and 8 of them succeeded (100%).
Latest mission
Next mission
Drawing unavailable
No upcoming mission scheduled.
Statistics summary
Payload to orbit
2026 so far
0 t
vs 4 t by this date in 2025
Last 7 days
0 t
vs 0.1 t weekly avg. over 365 days
Every LVM3 launch scheduled for the next seven days, in UTC.
No LVM3 launch is scheduled in the next seven days.
India's heaviest rocket, the LVM3, with two large solid boosters and a cryogenic upper stage. It launches Chandrayaan-2 in 2019 and Chandrayaan-3 in 2023, whose lander touches down near the Moon's south pole, as well as OneWeb batches and AST SpaceMobile's BlueBird satellites.
- Launches
- 8
- Success rate
- 100%
- 0 failures
- Builder
- ISRO
- Height
- 43.4 m
- Diameter
- 4 m
- Stages
- 2
- Boosters
- 2 × GSOM-S200
- Propellants
- Solid, UDMH / N2O4, LH2 / LOX
- Payload to LEO
- 10,000 kg
- Payload to GTO
- 5,000 kg
Launches per year
Show as table
| Year | Launches | Launch Vehicle Mark-3 (GSLV Mk III) |
|---|---|---|
| 2001 | 1 | 0 |
| 2003 | 1 | 0 |
| 2004 | 1 | 0 |
| 2006 | 1 | 0 |
| 2007 | 1 | 0 |
| 2010 | 2 | 0 |
| 2014 | 1 | 0 |
| 2015 | 1 | 0 |
| 2016 | 1 | 0 |
| 2017 | 2 | 1 |
| 2018 | 3 | 1 |
| 2019 | 1 | 1 |
| 2021 | 1 | 0 |
| 2022 | 1 | 1 |
| 2023 | 3 | 2 |
| 2024 | 1 | 0 |
| 2025 | 4 | 2 |
| 2026 | 2 | 0 |
GSLV rockets
| Rocket | Flown | Launches | Success rate | Height | Payload to LEO |
|---|---|---|---|---|---|
| GSLV | 2001 to 2010 | 6 | 33% | 49.1 m | 5,000 kg |
| GSLV Mk. II | 2010 to 2026 | 14 | 86% | 49 m | 5,000 kg |
| Launch Vehicle Mark-3 (GSLV Mk III) | 2017 to 2025 | 8 | 100% | 43.4 m | 10,000 kg |