
As of 17 October 2026, the Mir (3 stage) has one launch on record, on 4 December 2023, and it succeeded.
- Launches
- 1
- Success rate
- 100%
- 0 failures
- Builder
- ADD
- Height
- 20.6 m
- Diameter
- 2.2 m
- Stages
- 3
- Propellants
- Solid, MMH / N2O4
- Payload to LEO
- 100 kg
Launches per year
Mir (3 stage)
Other South Korean ADD Solid-Fuel SLV rockets
Show as table
| Year | Launches | Mir (3 stage) |
|---|---|---|
| 2023 | 1 | 1 |
South Korean ADD Solid-Fuel SLV rockets
| Rocket | Flown | Launches | Success rate | Height | Payload to LEO |
|---|---|---|---|---|---|
| Mir (3 stage) | 2023 | 1 | 100% | 20.6 m | 100 kg |
| Mir | Upcoming | 500 kg |
