Rocket family
New Glenn
United States2025 to 2026The New Glenn stands 98 m (322 ft) tall and can lift 45,000 kg to low Earth orbit. As of 28 November 2026, the New Glenn family has 3 launches on record, from 16 January 2025 to 19 April 2026, and 2 of them succeeded (67%).
Drawings: Flight Atlas (flightatlas.org) · CC BY 4.0
Latest mission
Communications
New Glenn
Apr 19, 2026
New Glenn's third flight failed to deliver AST SpaceMobile's BlueBird 7 satellite to its intended orbit after a BE-3U engine on the second stage lost thrust during its second burn, stranding the payload too low to recover; the reusable first stage still landed successfully on Blue Origin's Atlantic droneship.
Next mission
Drawing unavailable
No upcoming mission scheduled.
Statistics summary
Payload to orbit
2026 so far
6 t
vs 21 t by this date in 2025
Last 7 days
0 t
vs 0.1 t weekly avg. over 365 days
Every New Glenn launch scheduled for the next seven days, in UTC.
No New Glenn launch is scheduled in the next seven days.
New Glenn is Blue Origin's heavy rocket, named after John Glenn, with seven methane-fueled BE-4 engines on a first stage built to land on a ship and fly again. It reaches orbit on its first flight in January 2025 and lands its booster on its second, in November 2025, while sending NASA's ESCAPADE probes toward Mars.
- Launches
- 3
- Success rate
- 67%
- 0 failures · 1 partial
- First flight
- 2025
- New Glenn
- Last flight
- 2026
- New Glenn
- Rocket types
- 2
- 1 upcoming
Launches per year
Show as table
| Year | Launches |
|---|---|
| 2025 | 2 |
| 2026 | 1 |
New Glenn rockets
| Rocket | Flown | Launches | Success rate | Height | Payload to LEO |
|---|---|---|---|---|---|
| New Glenn | 2025 to 2026 | 3 | 67% | 98 m | 45,000 kg |
| New Glenn 9x4 | Upcoming | 120 m | 70,000 kg |

